arkansas highway 10 project

412 Benton County (Eutaw Construction Co. Inc.): $108,866,686.88, Two eastbound I-630 ramp lanes entering I-30 eastbound rather than being reduced to one lane, A new ramp lane from the eastbound I-630 ramp to the eastbound I-30 frontage road, A second lane from the westbound frontage road entrance ramp to I-30 westbound at I-630, East and West I-30 main lanes through the I-630 interchange narrowed from three to two lanes in both directions, I-30: Saline County: Highway 70 Sevier Street, I-40: Pulaski County: Highway 365 Interstate 430, I-630: Pulaski County: Baptist Hospital University Avenue, Highway 64: White County: Turner Road County Road 5, Highway 67: Pulaski/Lonoke County: Main Street Vandenberg Boulevard; Vandenberg Boulevard Highway 5, Highway 70: Garland/Saline County: Hot Springs Interstate 30, Highway 270: Garland County: Fleetwood Drive Highway 227: Ouachita River Fleetwood Drive, I-49: Washington/Benton County: Highway 71B Highway 412; Highway 412 Wagon Wheel Road; Highway 264 New Hope Road; Highway 62/102 Highway 72, Highway 65: Boone/Newton County: Maxie Camp Road Highway 206; Highway 206 Highway 123, Highway 65: Van Buren County: Highway 110 Clinton: Dennard Highway 110, Highway 412: Benton County: Highway 112 Interstate 49, Highway 549: Benton County: Highway 71 Interchange; Highway 71B Highway 72 South County Road 34 Missouri State Line, Highway 18: Craighead/Mississippi County: Monette Bypass; Manila East, Highway 64: Crittenden County: County Road 375 Highway 147; Cross County Line County Road 375, Highway 412: Lawrence/Greene County: Highway 67 Highway 141, Highway 82: Columbia/Union County: County Road 27 Highway 79; Airport Drive Highway 82B; Highway 98 County Road 27, Highway 82/425: Ashley County: Louisiana State Line Highway 82; Highway 425 Hamburg, Highway 167: Calhoun County: Highway 167 Improvements; Hampton Highway 274; Highway 274 North; Highway 79 South. The bridge is expected to welcome traffic as early as later this month, or early October, he said. Beginning at Bishop Lindsey Avenue, the project includes new pavement and re-striping eastbound I-30 to four lanes to the interchange with I-40 (North Terminal). Construction to widen Interstate 30 to six lanes in Saline County requires overnight lane closures. New signage on the upcoming Highway 10 bridge was hung last week, a visible indication that things are moving along with the construction that should quicken traffic with a flyover on Cantrell Road. $10.99. Which Projects Are Being Funded By This program. The construction plan includes widening Highway 10 to six lanes, divided with a center median from Pleasant Ridge Road to Please Valley Drive, said Dave Parker, spokesperson for the Arkansas Department of Transportation. 10 (Cantrell Road) interchange (split diamond) and continues with four main lanes in both directions between 3rd Street and 9th Street. Concrete roadway removal will continue for the next four to six weeks and structural steel removal will continue through the end of 2022 in accordance with the following process. "There will be several phases throughout the life of the project that will involve temporary pavement and traffic shifts in order to construct the entire project while maintaining three lanes in either direction along Interstate 30," Kimichik said. All rights reserved, nothing may be reprinted or reproduced (including framing) in whole or part without written permission from the publisher. [1] Its western terminus is at U.S. Route 71, just west of Greenwood, while its eastern terminus is at Arkansas Highway 10 near downtown Greenwood. He said Kiewit Massman Construction communicates upcoming impacts to traffic and residents in order to ensure safety and keep things running smoothly. Through a voter-approved constitutional amendment, the people of Arkansas passed a 10-year, half-cent sales tax to improve highway and infrastructure projects. To view construction progress photos, zoom in and scroll to find a camera icon and click it to see the most recent photos in a project area. According to Wylie, 17 projects are completed; 12 are currently under construction; and 12 more are yet to be let to bid. The Tip of the CAP event in Jonesboro will celebrate highway improvements in Northeastern Arkansas made possible by the half-cent sales tax revenue dedicated to road and bridge projects. Highway Construction Map - lane closures, road construction. Highway department has amended plans for Arkansas 112 improvements in Northwest Arkansas, now seeking public input by Ron Wood | July 20, 2021 at 7:18 a.m. According to Wylie, 17 projects are completed; 12 are currently under construction; and 12 more are yet to be let to bid. The bridge will include an improved opening for the Arkansas River navigational channel. The highway roughly parallels US 64 and Interstate 40 for its entire length, both approximately 20 miles (32km) to AR 10's north until their convergence in Little Rock. The public will have an opportunity to comment on the Highway 112 updates at a public hearing in 2022. We will likely get to around 150 by the end of summer.". CAP Information Line McGeorge Contracting plans to complete the $75 million . Kansas Expressway Extension Features BEBO Archway, Ritchie Bros. Sells More Than $244M of Equipment at Auction in Florida, Florida's Kings Highway Project Adds Capacity, Safety, ConExpo-Con/AGG, IFPE Launch App to Help Attendees Navigate Biggest Show Ever, LiuGong Brings Battery Electric 856H-E MAX Wheel Loader to North America, JM Wood Auction Celebrates 50 Years of Family Business, Yale to Build New School of Engineering & Applied Science Quadrangle, Takeuchi Introduces TB350R Short Tail Swing Excavator, Construction Equipment Guide Free shipping. Additionally, adjustments have been made to the alternative around Cave Springs in response to comments from the public meetings and through coordination with local officials. The new alternative in the Cave Springs/Bentonville area and the modified alternative around Cave Springs will be evaluated in the Environmental Assessment that is currently being completed. All build alternatives begin at Walnut Ridge, Arkansas and end at the Arkansas-Missouri state line, a distance of approximately 42 miles. Director of ARDOT. AR 10 intersects AR 45 in Hackett, and continues east to Greenwood. 501.569.2227 Mahlon Martin Street will be extended and improved from East 4th Street to President Clinton Avenue. Contents Copyrighted 2023, by Construction Equipment Guide, which is a Registered Trademark, registered in the U.S. Patent Office. Home / Divisions / Program Management / Construction Contract Development / Construction Contractor Information / Currently Advertised Projects. 01/31/2022. Recently, large sheets have been hung from the bridge while workers prime and paint the steel beams on its underside. As a reader of the Arkansas Times, you know were dedicated to bringing you tough, determined, and feisty journalism that holds the powerful accountable. 501.569.2227 The clover leaf ramps will be removed and the right-of-way between President Clinton Avenue and 3rd Street will be regraded to accommodate future use as a public space. A new on-ramp will be constructed to directly connect the I-30 westbound frontage road with I-630 westbound. Help us deliver the latest daily reporting and analysis on news, politics, culture and food in Arkansas. Planned street closures will be utilized in Little Rock and North Little Rock to allow demo over city streets for the next two months; Phase 1 is expected to last until the end of 2022 and complete demo in nine months. Once the bridges are complete, each direction will have three through lanes, two collector/distributer lanes, an auxiliary lanefor a total of 12 lanesand full width shoulders all around. The first step of the demolition process involves breaking the concrete deck with excavators. In compliance with Act 93 of 1967, you are hereby notified that members of the Arkansas State Highway Commission may gather for the following event: Wednesday, February 22nd 10:00 a.m. Arkansas Highway Commission MeetingARDOT Central Office10324 Interstate 30 Little Rock, Arkansas Contact: Ellen Coulter NR 23-044 February 21, 2023 The post . A few of the completed projects include: I-630 Pulaski County widening . Fort Washington, PA 19034 The rubble falls into a barge to be hauled off to a port and unloaded. Skeeter blue wave backsplash tile Jan. 19, 2023, at 4:55 p.m. Arkansas Panel Advances Bill to Restrict Drag Performances. The Arkansas Highway and Transportation Department has proposed widening Interstate 30 through Little Rock and North Little Rock from six to 10 lanes. That doesn't mean they'll have CAP2 projects beginning in 2023, she pointed out. Crews also will add lanes eastbound in North Little Rock; eastbound through the Broadway Street interchange to Bishop Lindsey Avenue; and reconstruct the Broadway Street interchange. Crash Summary and Study Guide. The clover leaf ramps will be removed and the right-of-way between President Clinton Avenue and 3rd Street will be regraded to accommodate future use as a public space. Thirty-one projects in 19 corridors across Arkansas are included in the CAP, which improves transportation connections to the four corners of Arkansas. Landscaping Supply Store 2213 AR-5 Mountain Home, AR 72653 (870) 425-0288 ( 26 Reviews ) Mower Warehouse Lawn Mower Repair Service 17 Fulbright Dr Mountain Home, AR. A bridge will be constructed to carry eastbound I-30 entrance ramp traffic over I-40 eastbound ramp lanes to enter traffic in the far-left eastbound lanes. The deadline to submit a question is the Wednesday prior to the scheduled letting date. Job CA0902 Highway 62/102 Highway 72, Job CA0903 Highway 71 Interchange Job CA0703 Highway 274 North Highway 65 (US 65)/US 67/US 167. Aside from Little Rock in Pulaski County, the highway also passes through county seats in four other Arkansas counties Greenwood, Sebastian County; Booneville, Logan County; Danville, Yell County; and Perryville, Perry County. BIDS WILL BE POSTED FOLLOWING THE DOWNLOADING OF BIDS. The enterprise, to be completed in mid-2023, is centered on a single-point urban exchange design in which the section of Cantrell Road, widened to six lanes from four, will use a ramp to take traffic over the North Rodney Parham Road intersection rather than through it, as Cantrell currently does. A collection of some of the most frequently asked questions concerning the Connecting Arkansas Program and the projects funded by the 10-year, half-cent sales tax. The Arkansas Department of Transportation (ArDOT) has announced that widening Cantrell Road (AR Highway 10) between Pleasant Ridge Road and Pleasant Valley Drive in Little Rock required the permanent closure of the latter street on June 1. Hotel / Motel - Hotel/Motel. The design also includes a feature known as a "Texas turnaround," which will allow drivers traveling south on I-430 to turn east on Cantrell. These projects contribute to the six-lane widening of Interstate 49 between Fayetteville and Bentonville. Highway 10 will be reconstructed along existing 2nd Street and extended from Cumberland Drive, below I-30, to Maholon Martin Street. Typically, the ArDOT designs its road plans and contractors submit bids based on their estimated costs of doing the work, with the lowest bidder being awarded the contract. The Project is in Pulaski County, Arkansas, within the city of Little Rock. Arkansas Bicycle Suitability Map - This map of the Arkansas State Highway System shows only average daily traffic volume and the availability of shoulders to aid the experienced rider in selecting routes within the state of Arkansas. BIDS WILL BE POSTED FOLLOWING THE DOWNLOADING OF BIDS. The addition of this alternative is in response to comments received at the public involvement meetings. August 22-28, 2022 By Wesley Brown Arkansas highway officials said the downtown 30 Crossing project has reached a major milestone as construction workers are prepping to shift traffic onto the newly constructed I-30 Arkansas River bridge during the upcoming Labor Day holiday. Land-based equipment on the project is predominantly new Caterpillar gear purchased by the joint venture from the local Riggs CAT dealer. This should improve the connection between Highway 10 and Interstate 430, he said. Skeeter Boats trolling motor bounce buster cup holder protect carpet bass boat. Highway 10 intersects Arkansas Highway 27 in Danville and AR7/AR 28 in Ola. Meanwhile, she said, it allows ARDOT to "get the project going faster than if we relied on federal funds" although they will use federal funds for some highway projects. The Connecting Arkansas Program is the largest highway construction program ever undertaken by the Arkansas Department of Transportation (ArDOT). The Hwy. The proposed project will examine alternatives to improve Hwy. All editorial material, photographs, drawings, letters, and other material will be treated as unconditionally assigned for publication and copyright purposes and are subject to Construction Equipment Guides unrestricted right to edit and comment editorially. Two eastbound I-630 ramp lanes will enter I-30 eastbound rather than being reduced to one lane. O-19-67. Mount Magazine, Arkansas's highest point, lies just to the north of the highway, as does the adjoining Mount Magazine State Park. ARKANSAS DEPARTMENT OF TRANSPORTATION Little Rock, Arkansas April 10, 2019 M E M O R A N D U M . The city is also planning a bike and pedestrian I-49 overpass at Watkins Avenue connecting Arkansas Children's Northwest with Randall Tyson Park. Job CA0904 Highway 71B Highway 72 South info@ConnectingArkansasProgram.com, ArDOT Public Inform Phase 1 occurs in Little Rock and North Little Rock. The 30 Crossing project will widen a 6.7-mile corridor through downtown Little Rock and North Little Rock to 10 lanes between Interstate 530 in Little Rock and Interstate 40 in North Little Rock. Ramp improvements at the I-630 interchange include: Work on 30 Crossing began in late summer, but Kimichik said the early winter months posed some weather-related challenges due to significantly colder temperatures and the high amount of rainfall Little Rock gets that time of year. Contributor articles do not necessarily reflect the policy or opinions of this publication. 11/22/2021 State Highway 55 between Smiths Ferry and Round Valley will remain closed through Thanksgiving weekend (at least November 29) as crews work diligently to secure the rockslide area near the Rainbow Bridge, about 20 miles south of Cascade. Deputy Director & Chief Engineer Rex Vines, Assistant Chief Engineer for Planning Jared Wiley, Assistant Chief Engineer for Design Mike Fugett, Assistant Chief Engineer for Operations Steve Frisbee, Assistant Chief for Administration Kevin Thornton, Disadvantaged Business Enterprise (DBE) Summary Reports, Environmental Impact Statements (EIS) & Environmental Assessments (EA), Historic American Engineering Record (HAER) Histories, Geospatial Information Systems (GIS)/Data Management, Global Navigation Satellite System (GNSS), Little Rock Area Stormwater Management Plan (SWMP), Notice for Public Comment, DTS Contract and Contract Information Packet, Notice of Proposed Rulemaking, Overweight Forestry Equipment, and Overweight Forestry Equipment Rules, Motor Fuel Import-Export Permits Order Form, Arkansas Commercial Truck Safety and Education Program (ACTSEP), Transportation Alternatives Program (TAP), Statewide Transportation Improvement Program (STIP), Properties for Sale and Bid Proposal Requests, Center for Training Transportation Professionals (CTTP), Arkansas Technology Transfer (T2) Advisory Committee, Transportation-Related Research Grant Program (TRRGP), HSIP Highway Safety Improvement Program Reports, Electric Vehicle Infrastructure Deployment Plan, Statewide Long Range Intermodal Transportation Plan. "Funding for the CAP2 is not available until July 2023," Wylie said. The remaining 30 percent of the tax revenue with be handed to local governments for road and street projects, with 15 percent each for cities and counties. The Arkansas Department of Transportation is preparing an Environmental Assessment for the proposed widening of Highway 112 between Highway 412 and Highway 12 through the cities of Tontitown, Elm Springs, Springdale, Cave Springs, Rogers, and Bentonville in Washington and Benton Counties, Arkansas. Motorists would travel west for a short distance, then make what amounts to a U-turn back to the east underneath the Cantrell Road ramp. The corridor will extend generally from Interstate 530 to Highway 67. The public will have an opportunity to comment on the Highway 112 updates at a public hearing in 2022. Work on Interstate 30 in Little Rock and North Little Rock involves weekly lane closures. State Rep. Justin Boyd, R-Fort Smith, and Highway Commissioner Keith Gibson worked to get the proposal before the . 11/08/2021. Continue your conversation over the web, email or SMS. The Project limits extend a total of 1.11 miles on Highway 10 from approximately Pleasant Ridge Road to Pleasant Valley Drive and includes: a. Materials needed for the job include 42,721 tons of aggregate base course; 175,106 tons of asphalt; 75,942 cu. District 1; District 2; District 3; District 4 . A quick look at which CAP projects are scheduled, under construction, or completed. This is part of a larger agreement . Watkins would also be extended west to Arkansas . Supplementary aims of the program are to support more than 40,000 jobs; drive economic development by making Arkansas locations more desirable to companies to locate and conduct business in; and provide a revenue source for new highway projects. There are several ramp improvements at the I-630 interchange. Imposed in July 2013, the state sales tax will contribute $1.8 billion (accrued from 70 percent of the tax revenue) toward highway and interstate construction projects. A collection of some of the most frequently asked questions concerning the Connecting Arkansas Program and the projects funded by the 10-year, half-cent sales tax. The Curtis Sykes Drive entrance ramp to eastbound I-30 will be north and east to tie into I-40 east. Conway, Arkansas 72032 (501) 450-6105. Do you have a question, comment, suggestion or concern? The idea received bipartisan approval and was added to the 2012 statewide general election ballot. The state committed to cover $10.5 million of the projected $12.5 million project. Orange barrels and road closed signs still line the sides of Cantrell Road. Developers are investing about $3.2 million into the project. The design-bid-build projects come in a "large range of sizes," she said, from $10 million to $187 million. . AR 10 passes through downtown Greenwood, passing the lone AR 10 spur route and the Old Sebastian County Jail, which is listed on the National Register of Historic Places. Job CA0706 Airport Drive Highway 82B, Job CA0201 Louisiana State Line Highway 82 Join us in the fight for truth. The next step after hanging signage is pouring the concert for barrier walls and finalizing the bridge asphalt, Parker said. The steel is taken off the river and sent to the scrap yard. Those who are braving the route during the construction are met with temporarily-hung stoplights and narrow lanes. The remaining portions of the project will be constructed during future phases. i-15 Cameras i-515 Cameras i-80 Cameras i-580 Cameras US 50 Cameras i-11 Cameras i-515_s Cameras US 95 Cameras US 93 Cameras i-215 Cameras US 395 Cameras us_50 Cameras Alabama Alaska Arizona Arkansas California Colorado Connecticut Delaware Florida. Click the image below to open the build out for the 30 Crossing project, Phase 1. The route begins at Oklahoma State Highway 120 and runs east to Hackett. The Broadway Street interchange will also be reconstructed. CAP Information Line Route map: .mw-parser-output .side-box{margin:4px 0;box-sizing:border-box;border:1px solid #aaa;font-size:88%;line-height:1.25em;background-color:#f9f9f9;display:flow-root}.mw-parser-output .side-box-abovebelow,.mw-parser-output .side-box-text{padding:0.25em 0.9em}.mw-parser-output .side-box-image{padding:2px 0 2px 0.9em;text-align:center}.mw-parser-output .side-box-imageright{padding:2px 0.9em 2px 0;text-align:center}@media(min-width:500px){.mw-parser-output .side-box-flex{display:flex;align-items:center}.mw-parser-output .side-box-text{flex:1}}@media(min-width:720px){.mw-parser-output .side-box{width:238px}.mw-parser-output .side-box-right{clear:right;float:right;margin-left:1em}.mw-parser-output .side-box-left{margin-right:1em}}, Media related to Arkansas Highway 10 at Wikimedia Commons. This project proposes to widen, reconstruct, and rehabilitate portions of Interstates 30 and 40, including widening the Arkansas River Bridge. Our monthly magazine is free at over 500 locations in Central Arkansas. Based upon the Environmental Assessment (EA), additional information included in the FONSI document, and the Disposition of Public Comments for the Location and Design Public Hearing, FHWA concludes that the proposed project will not have a significant impact on the environment. After the bridge is opened to traffic, construction will continue westward on Cantrell Road with drainage and paving projects, Parker said.